Our equipment: Transportation

Transportation

Transportation

With 180 different road tractor units, trucks and carriers and 270 semi-trailers of all types, the group is involved in all the main sectors of activity related to the transportation of goods by road.

Equipment name GVWR (tons) AGVW (tons)
Tractor units 4 x 2 19 – 26 60 – 70
Tractor units 6 x 4 26 – 34 70 – 120
Tractor units 6 x 4 – Boom truck crane 26 70
Tractor units 8 x 4 42 180
Flatbed trucks – Boom truck crane 19 40
Carriers (from 20 to 50 m3) 19 – 26 40
Ampliroll trucks

Equipment name Number of axles  Lenght  (meters) Payload (Tons) Height (centimeters)
Flatbeds 3 13.40 25 1.20 – 1.40
Flatbeds with side rails 3 13.40 25 1.20 – 1.40
Low flatbeds 3 13.40 – 20.00 25 1.10
Container trailers 3 13.40 25 1.10 – 1.40
Extendable flatbed semi-trailers  3/4 25-44 60 1.10 – 1.40

Equipment name Number of axles  Lenghts (meters) Payload(Tons) Height (centimeters)
Extendable extra-low flatbed semi-trailers 2 13 – 13 55 40
Extendable low flatbed semi-trailers 3 13 – 22 40 – 50 90
Extendable low flatbed semi-trailers 4 13 – 40 25 – 73 90
Extendable extra-low flatbed semi-trailers 3/4 13 – 20 40 – 50 40
Extendable low flatbed semi-trailers 6 22 67 100
Low flatbed semi-trailers 6 22 72 65
Car carrier low flatbeds

Equipment name Lenght (meters) Payload (Tons)
Taut liner (with or without side rails) 13.40 25
Taut liner with spool holders 13.40 25
Taut liner with tailgate 13.40 25
Equipment name GVWR (Tons) AGVW (Tons)
Liquid food tanker
Powder tanker
Equipment name Volume (m3)
Dumper trucks
Conveyer dump trucks  90
Grain dump trucks 70
19 February 2024

AUTAA joins CHARLES ANDRE

It's official since last night, November 8th,...
19 February 2024

A new LTM1090-4.2

This new year marks the completion of...
19 February 2024

A large-scale construction site in CADARACHE (13)

A large-scale construction site in CADARACHE (13)...
24 October 2023

AIRBUS aircraft transport

We were entrusted with a mission to...
3 February 2023

Installation of 180 tons pedestrian walkway in Périgueux !

Historic moment with the laying, last night,...
30 January 2023

Construction of the Vellèches ecobridge over the motorway A10 !

Three nights and about fifty workers to...
9 January 2023

Two cranes lifting of a nuclear power plant rotor !

143 tons to lift for each 750t...
15 December 2022

Out of gauche transport is on the way !

This week, we organized the transfer of...
7 September 2022

Lifting and setting of a 360 ton metal bridge!

Our 650 ton CC3800 crawler crane equipped...
23 June 2022

Head-to-head lifting on Line 18 of the « Grand Paris Express »

A crucial stage in the construction of...